{"id":35458,"date":"2024-05-30T18:17:38","date_gmt":"2024-05-30T16:17:38","guid":{"rendered":"https:\/\/interreg-sudoe.eu\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/"},"modified":"2026-02-18T12:34:56","modified_gmt":"2026-02-18T11:34:56","slug":"action-plan-for-the-technical-implementation-of-solutions","status":"publish","type":"resultado-proyecto-2","link":"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/","title":{"rendered":"Action plan for the technical implementation of solutions"},"content":{"rendered":"<p>As a result of the implementation of innovative solutions at pilot level, under the coordination of ACMG, an action plan for technical implementation will be developed, which will mean the decline at the operational level of the recommendations contained in the strategic document (White Paper). The document, which is eminently operational, will serve as a detailed guide to the implementation of the solutions tested on a pilot scale by the agricultural production fabric. In addition, it will be a realisation with a key role in transferring results to the whole Sudoe space.  Therefore, this realisation is expected to contribute significantly and lastingly to the solution of the problem of spring frost in the Sudoe space.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As a result of the implementation of innovative solutions at pilot level, under the coordination of ACMG, an action plan for technical implementation will be developed, which will mean the decline at the operational level of the recommendations contained in the strategic document (White Paper). The document, which is eminently operational, will serve as a detailed guide to the implementation of the solutions tested on a pilot scale by the agricultural production fabric. In addition, it will be a realisation with a key role in transferring results to the whole Sudoe space.  Therefore, this realisation is expected to contribute significantly and lastingly to the solution of the problem of spring frost in the Sudoe space.<\/p>\n","protected":false},"author":6548,"template":"","meta":{"_acf_changed":false,"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0},"convocatoria-proyecto-27":[3313],"estado-proyecto-27":[3362],"objetivo-especifico-proyecto-27":[3302],"periodo":[3555],"prioridad-proyecto-27":[3278],"publico-objetivo":[],"tematica-proyecto-27":[],"tipo-resultado":[3453],"class_list":["post-35458","resultado-proyecto-2","type-resultado-proyecto-2","status-publish","hentry","convocatoria-proyecto-27-1st-call","estado-proyecto-27-on-going","objetivo-especifico-proyecto-27-so-2-4-climate-change-adaptation-risk-prevention","periodo-2021-2027-en","prioridad-proyecto-27-1-preserving-sudoes-natural-capital-and-adapting-to-climate-change","tipo-resultado-strategies-action-plans"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Action plan for the technical implementation of solutions - Interreg Sudoe<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Action plan for the technical implementation of solutions - Interreg Sudoe\" \/>\n<meta property=\"og:description\" content=\"As a result of the implementation of innovative solutions at pilot level, under the coordination of ACMG, an action plan for technical implementation will be developed, which will mean the decline at the operational level of the recommendations contained in the strategic document (White Paper). The document, which is eminently operational, will serve as a detailed guide to the implementation of the solutions tested on a pilot scale by the agricultural production fabric. In addition, it will be a realisation with a key role in transferring results to the whole Sudoe space. Therefore, this realisation is expected to contribute significantly and lastingly to the solution of the problem of spring frost in the Sudoe space.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/\" \/>\n<meta property=\"og:site_name\" content=\"Interreg Sudoe\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/interregsudoe\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-18T11:34:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/interreg-sudoe.eu\/wp-content\/uploads\/2024\/03\/download.png\" \/>\n\t<meta property=\"og:image:width\" content=\"344\" \/>\n\t<meta property=\"og:image:height\" content=\"147\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@Sudoe5\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/\",\"url\":\"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/\",\"name\":\"Action plan for the technical implementation of solutions - Interreg Sudoe\",\"isPartOf\":{\"@id\":\"https:\/\/interreg-sudoe.eu\/en\/#website\"},\"datePublished\":\"2024-05-30T16:17:38+00:00\",\"dateModified\":\"2026-02-18T11:34:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/interreg-sudoe.eu\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Action plan for the technical implementation of solutions\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/interreg-sudoe.eu\/en\/#website\",\"url\":\"https:\/\/interreg-sudoe.eu\/en\/\",\"name\":\"Interreg Sudoe\",\"description\":\"Interreg Sudoe\",\"publisher\":{\"@id\":\"https:\/\/interreg-sudoe.eu\/en\/#organization\"},\"alternateName\":\"Interreg Sudoe\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/interreg-sudoe.eu\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/interreg-sudoe.eu\/en\/#organization\",\"name\":\"Interreg Sudoe\",\"alternateName\":\"Interreg Sudoe\",\"url\":\"https:\/\/interreg-sudoe.eu\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/interreg-sudoe.eu\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/interreg-sudoe.eu\/wp-content\/uploads\/2024\/03\/logo-interreg.png\",\"contentUrl\":\"https:\/\/interreg-sudoe.eu\/wp-content\/uploads\/2024\/03\/logo-interreg.png\",\"width\":1200,\"height\":675,\"caption\":\"Interreg Sudoe\"},\"image\":{\"@id\":\"https:\/\/interreg-sudoe.eu\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/interregsudoe\",\"https:\/\/x.com\/Sudoe5\",\"https:\/\/www.youtube.com\/channel\/UCeGx2edoB32beRc9dbKA2vw\",\"https:\/\/www.linkedin.com\/company\/interreg-sudoe-programme\/\",\"https:\/\/www.flickr.com\/photos\/148704685@N06\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Action plan for the technical implementation of solutions - Interreg Sudoe","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/","og_locale":"en_US","og_type":"article","og_title":"Action plan for the technical implementation of solutions - Interreg Sudoe","og_description":"As a result of the implementation of innovative solutions at pilot level, under the coordination of ACMG, an action plan for technical implementation will be developed, which will mean the decline at the operational level of the recommendations contained in the strategic document (White Paper). The document, which is eminently operational, will serve as a detailed guide to the implementation of the solutions tested on a pilot scale by the agricultural production fabric. In addition, it will be a realisation with a key role in transferring results to the whole Sudoe space. Therefore, this realisation is expected to contribute significantly and lastingly to the solution of the problem of spring frost in the Sudoe space.","og_url":"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/","og_site_name":"Interreg Sudoe","article_publisher":"https:\/\/www.facebook.com\/interregsudoe","article_modified_time":"2026-02-18T11:34:56+00:00","og_image":[{"width":344,"height":147,"url":"https:\/\/interreg-sudoe.eu\/wp-content\/uploads\/2024\/03\/download.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_site":"@Sudoe5","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/","url":"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/","name":"Action plan for the technical implementation of solutions - Interreg Sudoe","isPartOf":{"@id":"https:\/\/interreg-sudoe.eu\/en\/#website"},"datePublished":"2024-05-30T16:17:38+00:00","dateModified":"2026-02-18T11:34:56+00:00","breadcrumb":{"@id":"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/interreg-sudoe.eu\/en\/resultado-proyecto-2\/action-plan-for-the-technical-implementation-of-solutions\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/interreg-sudoe.eu\/en\/"},{"@type":"ListItem","position":2,"name":"Action plan for the technical implementation of solutions"}]},{"@type":"WebSite","@id":"https:\/\/interreg-sudoe.eu\/en\/#website","url":"https:\/\/interreg-sudoe.eu\/en\/","name":"Interreg Sudoe","description":"Interreg Sudoe","publisher":{"@id":"https:\/\/interreg-sudoe.eu\/en\/#organization"},"alternateName":"Interreg Sudoe","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/interreg-sudoe.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/interreg-sudoe.eu\/en\/#organization","name":"Interreg Sudoe","alternateName":"Interreg Sudoe","url":"https:\/\/interreg-sudoe.eu\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/interreg-sudoe.eu\/en\/#\/schema\/logo\/image\/","url":"https:\/\/interreg-sudoe.eu\/wp-content\/uploads\/2024\/03\/logo-interreg.png","contentUrl":"https:\/\/interreg-sudoe.eu\/wp-content\/uploads\/2024\/03\/logo-interreg.png","width":1200,"height":675,"caption":"Interreg Sudoe"},"image":{"@id":"https:\/\/interreg-sudoe.eu\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/interregsudoe","https:\/\/x.com\/Sudoe5","https:\/\/www.youtube.com\/channel\/UCeGx2edoB32beRc9dbKA2vw","https:\/\/www.linkedin.com\/company\/interreg-sudoe-programme\/","https:\/\/www.flickr.com\/photos\/148704685@N06\/"]}]}},"_links":{"self":[{"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/resultado-proyecto-2\/35458","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/resultado-proyecto-2"}],"about":[{"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/types\/resultado-proyecto-2"}],"author":[{"embeddable":true,"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/users\/6548"}],"wp:attachment":[{"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/media?parent=35458"}],"wp:term":[{"taxonomy":"convocatoria-proyecto-27","embeddable":true,"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/convocatoria-proyecto-27?post=35458"},{"taxonomy":"estado-proyecto-27","embeddable":true,"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/estado-proyecto-27?post=35458"},{"taxonomy":"objetivo-especifico-proyecto-27","embeddable":true,"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/objetivo-especifico-proyecto-27?post=35458"},{"taxonomy":"periodo","embeddable":true,"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/periodo?post=35458"},{"taxonomy":"prioridad-proyecto-27","embeddable":true,"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/prioridad-proyecto-27?post=35458"},{"taxonomy":"publico-objetivo","embeddable":true,"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/publico-objetivo?post=35458"},{"taxonomy":"tematica-proyecto-27","embeddable":true,"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/tematica-proyecto-27?post=35458"},{"taxonomy":"tipo-resultado","embeddable":true,"href":"https:\/\/interreg-sudoe.eu\/en\/wp-json\/wp\/v2\/tipo-resultado?post=35458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}