Action plan for the technical implementation of solutions

As a result of the implementation of innovative solutions at pilot level, under the coordination of ACMG, an action plan for technical implementation will be developed, which will mean the decline at the operational level of the recommendations contained in the strategic document (White Paper). The document, which is eminently operational, will serve as a detailed guide to the implementation of the solutions tested on a pilot scale by the agricultural production fabric. In addition, it will be a realisation with a key role in transferring results to the whole Sudoe space. Therefore, this realisation is expected to contribute significantly and lastingly to the solution of the problem of spring frost in the Sudoe space.

Leave a Reply

Your email address will not be published. Required fields are marked *